Showing posts with label EM-1. Show all posts
Showing posts with label EM-1. Show all posts

Thursday, January 17, 2013

NASA, ESA agree on new Orion-MPV SM


This animation shows NASA's Orion spacecraft as it will appear on its Exploration Mission-1 in 2017, complete with a service module to be provided by the European Space Agency. After Orion blasts off atop a Space Launch System rocket, the ESA-provided service module will fuel and propel the capsule on its journey through space. Exploration Mission-1 in 2017 will be the first mission to incorporate both the Orion vehicle and NASA's new Space Launch System. It will follow the upcoming Exploration Flight Test-1 in 2014, in which an uncrewed Orion will launch atop a Delta IV Heavy rocket and fly 3,600 miles above Earth's surface, farther than a human spacecraft has gone in 40 years.

NASA-ESA agreement on Orion Service Module
for one unit, plus spares

Marcia Smith
SpacePolicyOnline.com

NASA and the European Space Agency (ESA) provided more details today of their agreement for ESA to provide the service module for NASA's Orion spacecraft.

ESA Director General Jean-Jacques Dordain announced the plan following ESA's ministerial meeting in November.  Dordain extolled its significance both in terms of demonstrating ESA's commitment to partner with NASA in human exploration of space beyond low Earth orbit and in NASA allowing other countries to be in the "critical path" of the U.S. human spaceflight program.

At a press conference today, NASA and ESA officials continued to tout the importance of the agreement, although as details emerge it seems less dramatic than at first glance.

Read the full article, HERE.

Thursday, March 1, 2012

EM1: 2017 SLS/Orion lunar mission outlined

It's baseline development all but complete, the Orion MPV is on track to be the capstone of a return to American civilian heavy-lift spaceflight in 2017, if the US commitment to commercial low-Earth orbit crew transfers lives up to it hopes [NASA].
Chris Bergin
NASASpaceflight.com

The debut of the Space Launch System (SLS) will send the Orion (MPCV) on a 7-10 day mission to the Moon, with an aim to qualify the Heavy Lift Launch Vehicle (HLV) and Beyond Earth Orbit (BEO) Orion to carry humans into deep space. Exploration Mission 1 (EM-1) involves sending Orion around the far side of the Moon, prior to a splashdown in the Pacific Ocean.

Pitch over, at T L I-plus 20 minutes
SLS-1 – EM-1: With a launch date of December 17, 2017, the historic mission will aim to hand NASA a Christmas present of becoming a successful pathfinder for crewed flights on the new spacecraft, in turn providing a baseline for a return to exploration in deep space for the first time since the 1970s.

Launch date slips are a natural part of the space launch business, although the development roadmap for the SLS shows a large amount of schedule mitigation through the key review milestones leading up to the opening mission.

Ironically, the main threat to the schedule target may be due to problems unrelated to Orion or the SLS. This is due to the law of the 2010 Authorization Act, which requires SLS and Orion to provide a back-up role for the International Space Station (ISS), in the event of major disruption in the Commercial Crew arena.

This would be an undesirable situation for all concerned, not least because the 70mt SLS and BEO Orion would be vastly overpowered – and economically overpriced – for the role of lofting astronauts to the orbital outpost in Low Earth Orbit. At the same time, it would mean the Commercial Crew partners would have failed to achieve their designated role several years after the initial target of 2015.

Read the full article HERE.